TonneMiles

Bulk carrier · Norway flag · built 2015

BELHAWK: CO₂ emissions 2019–2025

IMO 9748461 3 reporting years

CO₂ reported 2023
951 t
Fuel burned
303 t
Distance
4,232 nm
Time at sea
403 h
Emitted at berth
5% of total
Share of year under way
5%
Gross tonnage
34,815

BELHAWK against its type

Built in 2015, it is 3 years newer than the median bulk carrier on this register, which was built in 2012 (6,882 vessels with a known build year). At 34,815 gross tonnage it is larger than 50% of the other 6,571 bulk carriers with a recorded tonnage. It is one of 75 bulk carriers here under the Norway flag, 0.9% of the 8,138 on the register. The same builder is recorded for 114 other vessels here, 76 of them bulk carriers. Its MRV returns name it STAR PATHFINDER for 2019 and BELHAWK for 2023–2025. The reported port of registry changed: PANAMA (2019), then Egersund (2023–2025).

Its 951 t of CO₂ for 2023 is 72% below the median of 3,386 t among the 3,573 bulk carriers on this register that reported for 2023. Per nautical mile it emitted 224.7 kg CO₂, 18% below the type median of 272.6 kg. It logged 403 hours at sea against a median of 1,186 hours for its type that year. 5.4% of its 2023 emissions were at berth; the median for bulk carriers was 4.3%. Its efficiency percentile within the type went from 16 in 2019 to 43 in 2023 (lower is more efficient). Of the 2 sister ships listed below with a 2023 return, 0 reported a lower CO₂ per nautical mile than this vessel.

No EU/EEA voyages were reported for 2025: zero CO₂ and zero time at sea, left out of the trend and of any ranking.

Emissions by year2019–2025

Year CO₂ (t) Fuel (t) Distance (nm) At sea (h) At berth (t) kg CO₂/nm EEOI Percentile
2025 No EU/EEA voyages reported
2023 951 303 4,232 403 52 224.7 7.5 43
2019 6,681 2,117 24,066 2,531 148 277.6 5.6 16

Vessel particulars

IMO number
9748461
Previously reported as
STAR PATHFINDER
Ship type
Bulk carrier
Gross tonnage
34,815
Length overall
199.9 m
Beam
32.2 m
Year built
2015
Flag state
Norway per EU MRV 2025
Builder
Iwagi Zosen
Port of registry
Egersund MRV 2023
Technical efficiency (design)
EEDI (4.18 gCO₂/t·nm)
Verifier
DNV, Germany
Accreditation
VS-16026-01
Compliance document issued
2024-06-07
Compliance document expires
2025-06-30

Efficiency against its own type2023

Position 1,412 of 3,262 qualifying bulk carriers by EEOI, at the 43rd percentile. The dashed line is the type median, 8.0; this vessel reported 7.5.

0255075100more efficientless efficientThis vessel: 43rd percentile, EEOI 7.5

EEOI divides emissions by transport work, which for this vessel and year was 127,495,979 tonne-miles over 4,232 nautical miles.

Reported CO₂ by year

2019: 6,681 t20196,6812023: 951 t2023951

Reported CO₂ in 2023 was 85.8% lower than in 2019, for EU/EEA voyages only. No return is recorded for 2020, 2021, 2022, 2024, so the series has gaps.

From 2019 to 2023, emissions fell 85.8% while distance sailed fell 82.4%and CO₂ per nautical mile fell 19.0%.That points mainly to how much the vessel sailed, rather than the other.

Where the 2023 emissions occurred

At berthAt berth: 52 t52Voyages to an EEA portVoyages to an EEA port: 165 t165Voyages from an EEA portVoyages from an EEA port: 735 t735

Verifier history

From reporting yearVerifierAccredited in
2019Nippon Kaiji KyokaiJapan
2023DNVGermany
2025HELLENIC LLOYD'S S.A.Greece

A change of verifier is not in itself a sign of anything being wrong.

Sources and how to read this

This page draws on 3 MRV reporting years, an efficiency ranking, 5 of 5 vessel particulars and a name history. Not found in the sources for this vessel: AIS movements in Norwegian waters, a licensed photograph, a sanctions listing and US port state inspections.

Empty means unreported, never zero. How EEOI, distance, percentiles and sister ships are handled is explained under reading a vessel page. Something wrong? See corrections.

Comparable vesselssister ships and nearest by tonnage